Global|Home|Site map|Contact |Français
 Search form button
 
 
 

Solution: Power factor correction

 
 

 

 

Value proposition

Solution in brief
  • A Power Factor Correction bank installed close to the load is intended to optimize the Power Factor at the considered network point, and the flow of reactive power.
  • Besides, the installation of a capacitor bank has a fast pay-back thanks to the saving on your electrical invoice.

Value proposition
  • Reduce your operating expenses up to 10%
    - Reduce the energy bill if penalties or bonus are applied
    - Save energy thanks to the reduction of the losses
  • Reduce your capital expenses up to 30%
    - Optimize the size of your installation
    - Increase the power availability
    - Reduce the size of transformers, cables and switchgear equipments
  • Use environment friendly solutions
    - Contribute to the reduction of CO2 emission thanks to lower energy consumption up to 3%

Differentiation factors
  • Improve your business performance
    - Increase the life-time and reliability of electrical devices
    - Reduce the voltage drops
    - Reduce the level of harmonics

Solution architecture

 

 
1. HV capacitor skid for transmission network
2. MV capacitor for distribution network
3. MV capacitor Bank
4. LV automatic capacitor bank
5. LV fixed capacitor bank
6. MV capacitor
  
 
To know more 

Requests for Solutions, Products and Services information

Success Stories

  • Electricity of France – France (2005)
    HV & MV power factor correction banks for HV substations and HV/MV substations 15 and 20 kV, power up to 2880 kVAr
  • SIAP Valenton water treatment – France (2005)
    MV Propivar power factor correction banks 11kV, 2Mvar
  • Lafarge Cement – France & several countries (2003)
    MV Propivar power factor correction banks 11 kV, power up to 2 MVAr
  • University Hospital – Oran – Marocco (2004)
    LV Rectimat 2 power factor correction banks
  • Barrajas Madrid airport – Spain (2001)
    50 LV Rectimat 2 power factor correction banks (500 kVAr )
  • Sofitel Hotel - Oran – Marocco (2001)
    LV Rectimat 2 power factor correction banks

Solution breakdown & downloads