Global|Home|Site map|Contact |Français
 Search form button
 
 
 

Solution: Simple load control/shedding solution

 
 

 

 

Value proposition


Main drivers

  • Avoidance of peak demand pentalies.
  • Maintain power to critical process.

Solution in brief
 

  • This simple solution use current control to automatically monitor and shed a load if a pre-set limit is exceeded.

Value proposition
  • Avoid paying peak demand penalties, by installing devices which can control consumption and automatically shut down non-critical loads.
  • Shed less critical loads and keep the critical process running.

Differentiation factors

  • Use current control to automatically monitor. It is very easy to install and just by adding a time delay can be programmed before the load is re-connected.
  • By adding a GTC building and management system control safety can be enhanced  in an installation. The load can be turned on again only after being checked by competent personnel.

Solution architecture

 

 
  
 
To know more 

Requests for Solutions, Products and Services information

Solution breakdown & downloads

  • Main Products & Systems
    _ Protection circuit-breaker: C60 and DPN
    _ Current control: RCI
    _ Time delay: ACTt
    _ Current transformer: Ti
    _ Load shedding contactor: CDsc